Day 039: We’ve are Framed!

IMG_1702The frame stage is officially complete. The house has finally taken shape and to be completely honest it’s looking a little bit smaller than expected – probably because all the display were Q1 and we’re having the Q2 built. That’s about 3.62 squares difference in size but the number of rooms remain the same – the picture below gives an idea on the differences between the Lexington Belles and Lexington Luxes. The Lexington 993 has since been removed from this list as the remaining display center at Point Cook that has this house on show has since been closed down. A little bit sad that it did since we based most of our decision on color schemes on this house – we’re relieved that we manage to save a couple of pictures of it.Screen Shot 2013-03-11 at 9.51.34 PM

As usual more pictures to log the progress of the build below, enjoy!

IMG_1720

Advertisements
This entry was posted in Frame Stage, March 11th, 2013, Milestones. Bookmark the permalink.

2 Responses to Day 039: We’ve are Framed!

  1. Ray says:

    Don’t worry about it appearing smaller than you thought. There’s always been a schism between the reality and our imagination when it comes to m2. You’ll still have room to swing a cat. Sorry Kuddles…

    • AWBL1982 says:

      Haha that’s funny… :-D… Thanks Ray, will definitely get used to the space, I’m sure it won’t be long before we whine a out cleaning it… Lol

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s