Category Archives: Lock Up Stage

Everything related to the lock up stage of the build

Day 523: The Complete Build (Photo Edition)

This gallery contains 52 photos.

Advertisements

Rate this:

Gallery | Leave a comment

Follow Ups and Color Schemes

There will be two parts to this post the first being the follow up from yesterday’s update “This is not a Dream ” and second Color schemes. The latter is probably more exciting but I’ll get the former out of … Continue reading

Rate this:

Posted in Lock Up Stage, Painting | 1 Comment

Day 063: Lock Up!

For the most part, this has been a dream and pensive is probably not the best word to describe my current state. I think it’s somewhere in between that and reflective. As the loan drawdowns get larger, reality is beginning … Continue reading

Rate this:

Posted in April 4th, 2013, Lock Up Stage, Milestones | Leave a comment

Day 058: Plastered! (Photo Edition)

This gallery contains 9 photos.

Rate this:

Gallery | 1 Comment

Day 048: Wraps… Yum!

The more I look at the insulation wraps around the frames the more I’m starting to wonder if the smurfs have anything to do with the lock-up process. There’s just a little more to be done with the insulation wrapping … Continue reading

Rate this:

Posted in Lock Up Stage | Leave a comment

Day 045: Roof Tiled, Plumbed and Guttered!

The roof tiles, rough-in plumbing, rain gutter and fascias are in. There are still a small part of the house to be tiled but according to Dan (SS) this will all be done by 18th March 2013. Wrapping and bricks … Continue reading

Rate this:

Posted in Lock Up Stage | Leave a comment